With 3 boilers and 2 water heaters on the decline, the Facilities Director at Furnace Brook Middle School in Marshfield, MA knew it was time for a change. The school district turned to The Wilkinson Companies to guide them through a boiler room overhaul.

Watch our before and after look at the upgrades, which include 6 new RBI Flexcore modulating, condensing boilers and two state-of-the-art Intellihot water heaters.

The middle school is now saving space, saving energy and preventing downtime. Our overhaul turned the school boiler room into a high efficiency showroom.

 

 

Watch more videos on Boiler Room Insider.

Written by Elaina Schlumper